Film Production

Film Production

Project 1

Challenge:
Provide climate control to a movie set scene

Equipment required:
1 A/C Rooftop

Duration of installation:
1 day

Solution:
Our portable Rooftop A/C Unit can be easily placed in various locations depending on your needs. In this case there was no need to sacrifice comfort in order to have the equipment hidden while in use