Challenge:
A hospital’s new cooling system was malfunctioning and was in need of a fast and temporary solution.
Equipment required:
2 chillers
Duration of installation:
4 days
Solution:
the solution to this case was to offer the hospital a redundancy system. Where our equipment replaced their new system.