Challenge: Critical industry requiring a sizeable installation

In Pointe-Claire, Montreal, HVAC Rentals successfully concluded a two-and-a-half-month-long complex data center installation project, demonstrating their commitment to client satisfaction and flexibility in handling technical changes, leading to commendation from the project lead for their excellent technical service.

Equipment Required:

• Pumps
• Buffer tanks
• Chillers
• Transformers
• Distribution panels
• Air filters

Obstacles: Plan placement changes and precision

Facing challenges in the Pointe-Claire, Montreal data center project, HVAC Rentals earned praise from project lead Alexandre Rousseau for their commitment to client satisfaction and precision in delivering a tailored HVAC solution during the two-and-a-half-month installation.

Location: Quebec

Sector: Data Centers

Challenge: Critical industry requiring a sizeable installation

In Pointe-Claire, Montreal, HVAC Rentals successfully concluded a two-and-a-half-month-long complex data center installation project, demonstrating their commitment to client satisfaction and flexibility in handling technical changes, leading to commendation from the project lead for their excellent technical service.

A data center in Pointe-Claire, Montreal contacted HVAC Rentals for a sizable job in a critical place. The project was led by our representative Benoit Rousse, and involved the organization of cranes for specific unit placement atop the client building and took two and a half months to complete the intricate installation. Our team had the challenge of having many technical placement changes to the layout of equipment which HVAC Rentals accommodated as our priority is client satisfaction and the flexibility that it takes to make every project a success to our client’s standards.  Our units were needed for a duration of 6 months, starting mid-summer until the end of January as a backup plan while theirs was out for repairs. Considering that our client’s servers run worldwide, it would pose an immense problem in the event of a unit failure; our accuracy and expertise had no room for error.  

Our fleet of HVAC equipment rentals can be for long-term or short-term solutions, with a complete turnkey service included for a tailored solution. 

This project was a great success and was praised by project lead Alexandre Rousseau from the P.Eng CEM certified saying “What a great job! Several pumps, buffer tanks, chillers, transformers, electrical panels, air-conditioning units and their respective hardware were supplied and installed by Loue Froid. This cooling equipment package totaled nearly 150 tons of cooling and 60,000 CFM in temporary installation. Congratulations to Benoit Rousse and his team, who provided excellent technical service”. – Alexandre Rousseau 

Equipment Required:

• Pumps
• Buffer tanks
• Chillers
• Transformers
• Distribution panels
• Air filters

The project achieved tremendous success and received accolades from the project lead, who is a P.Eng CEM certified professional. The feedback included appreciation for the outstanding work, where Loue Froid supplied and installed various equipment, such as pumps, buffer tanks, chillers, transformers, electrical panels, and air-conditioning units, along with their corresponding hardware. The cooling equipment package amounted to nearly 150 tons of cooling and 60,000 CFM in temporary installation. Special recognition was given to Benoit Rousse and his team for delivering excellent technical service.

Obstacles: Plan placement changes and precision

Facing challenges in the Pointe-Claire, Montreal data center project, HVAC Rentals earned praise from project lead Alexandre Rousseau for their commitment to client satisfaction and precision in delivering a tailored HVAC solution during the two-and-a-half-month installation.

The data center project in Pointe-Claire, Montreal, undertaken by HVAC Rentals, faced several significant obstacles. The complexity of the job, managed by our representative Benoit Rousse, required meticulous planning, including the coordination of cranes for specific unit placements atop the client’s building. This intricate installation took two and a half months to complete.

One of the major challenges encountered by our team was the need for multiple technical placement changes to the layout of equipment. Despite these challenges, HVAC Rentals prioritized client satisfaction and demonstrated flexibility to accommodate these changes. The project’s success hinged on our commitment to meeting the client’s standards and ensuring the adaptability required for every project.

The duration of the project added another layer of complexity, as our units were required for a six-month period, starting mid-summer until the end of January. This timeframe served as a crucial backup plan while the client’s own equipment underwent repairs. Given that the client’s servers operated globally, any unit failure could have posed a severe problem. Therefore, precision and expertise were paramount, leaving no room for error in our execution.

In offering a fleet of HVAC equipment rentals for both long-term and short-term solutions, HVAC Rentals provided a complete turnkey service, tailored to the specific needs of the project. Despite the obstacles faced, the project was ultimately deemed a great success and received praise from project lead Alexandre Rousseau, a P.Eng CEM certified professional. The comprehensive cooling equipment package, which included pumps, buffer tanks, chillers, transformers, electrical panels, air-conditioning units, and associated hardware, totaled nearly 150 tons of cooling and 60,000 CFM in temporary installation. Congratulations were extended to Benoit Rousse and his team for delivering excellent technical service under challenging circumstances.