Industrial/Factory

Industrial/Factory

Project 1

Challenge:

A plant needed an air conditioning system as its production was slowing down due to continuous labor breaks.

Equipment required:

  • 1 chiller
  • 2 air handlers

Obstacles:

limited space

Solution:
Plant and labor size needed to be analyzed to determine the equipment required to stabilize the plant’s climate and drop the temperature to enable continuous workflow.